Worked today. Great team work, good patients.
At home, I went out to the back room. The drywall is removed from the back wall so the studs are showing. They also removed part of the ceiling. Not as much as I would have, but as long as it's going to dry up and not flood again.... Some of the insulation is gone, and what's left looks to be dry. A lot of the wood looks like it has been wet, and some still is. The back door opens much better already. I wonder how wet the insulation was...
The vinyl floor has been removed and is upside down on the basement floor. The sub floor has large water stains on it. And it has "bubbled" in a few places. It should probably be replaced. We'll see if it happens.
Tomorrow is another work day, with another drill. Not one of ours, but a hospital wide safety drill.
Stay warm.
Thank you for reading. Hugs.
Wednesday, February 26, 2014
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment