The back room has been demo'd--drywall off, (no insulation had been in the walls) new insulation installed. Junction boxes to contain splices. The back wall is still open to facilitate drying. And the inside door opens and closes with much less resistance. The flooring (luan or lauan--I just looked it up) is also drying out. It was really wet out into the middle of the room. Good thing they took the vinyl up.

I went out for a few groceries, shoveled the little bit of snow off the driveway. And even though the temperature was only in the teens, the sun melted the leftover stuff.